System and Fittings

Plumbing
Cross linked polyethylene PEX pipes, manifolds installed at a false ceiling in each bathroom and emergency bottom in each bathroom 
Hot water storage tank with vitrified accumulation LAPESA of 150 liter in 80 m2 apartments and 300 liters in 180 m2 apartments

Heating / air conditioning
Heating, cooling will be supplied by the hot / cold water lines from the hot / cold central thermal power of the community. Individual meters for the energy consumed in heating and cooling Under floor heating throughout the apartment. Air conditioning with ducts in living / dining rooms and via AIRLAN fan coils and duct CLIMAVER NETO in the bedrooms.